ELEMENTARY SCHOOL BUILDING ENVELOPE PROJECT, OSHAWA

Completed flashing around the sun tunnel curbs” Caption =”Completed flashing around the sun tunnel curbs.

Aerial view

Scaffolding has been set up along the elevation of the building in preparation for air vapour barrier membrane and brick veneer installation

Scaffolding has been set up along the elevation of the building in preparation for air vapour barrier membrane and brick veneer installation.

Primer has been applied to a clean and dry substrate for membrane installation.

Primer has been applied to a clean and dry substrate for membrane installation.

nstalled air vapour barrier membrane is free from deficiencies, with sealants having been applied around the penetrations to keep the membrane continuously sealed.

Installed air vapour barrier membrane is free from deficiencies, with sealants having been applied around the penetrations to keep the membrane continuously sealed.

The contractor is installing 4-ply fiberglass membrane in hot asphalt over 1 ply of #15 organic felts.

The contractor is installing 4-ply fibreglass membrane in hot asphalt over 1-ply #15 organic felts.

The contractor is installing 4-ply fiberglass membrane in hot asphalt over 1 ply of #15 organic felts around sun tunnel curbs.

The contractor is installing 4-ply fibreglass membrane in hot asphalt over 1-ply #15 organic felts around sun tunnel curbs.

Building Owners and Managers Association (BOMA) member Canadian Roofing Contractors Association (CRCA) member Construction Specifications Canada (CSC) member Green Roofs For Healthy Cities member Sealant and Waterproofing Association of Ontario member Ontario Building Envelope Council member Ontario Industrial Roofing Contractors Association member Roof Consultants Institute member International Facility Management Association member